Meanwhile, André installed the bow thruster and the depth sounder.
(Click on a photo to enlarge it.)
In the last week of July, the masts were brought to the ship by KTF. There, Auke and Wiebe from M de Groot Jachttuigerij installed the main stays. The next day, the masts were put on board in just 45 minutes. Finally, Auke and Wiebe installed the last stays and furling systems for the headsails. Then came the booms and gaffs.
Meanwhile, UB Sails has visited to take measurements. The sails will be ready this fall. We can’t wait to sail the Quadra for the first time. Until then, we’ll enjoy her new look.
Watch the mast installation video on our YouTube channel.









Om de beste ervaringen te bieden, gebruiken wij technologieën zoals cookies om informatie over je apparaat op te slaan en/of te raadplegen. Door in te stemmen met deze technologieën kunnen wij gegevens zoals surfgedrag of unieke ID's op deze site verwerken. Als je geen toestemming geeft of uw toestemming intrekt, kan dit een nadelige invloed hebben op bepaalde functies en mogelijkheden.