The construction of the Quadra is nearing completion! The carpenter is finished and will only come once more for the final finishing touches. The lighting — both inside and out — is working, water flows from the taps, the ventilation system provides fresh air, and the...
Tell Tales
Volg ons blog
Q
Volg hier ons blog…
De blogs zijn zowel in het Engels als in het Nederlands geschreven.
A new look
From approximately mid-May to mid-July, Quadra's hull was renovated at Multiship. First, it was filled and sanded. Multiple times and multiple layers were applied until the hull was smooth and the transition to the new keel was smoothed. Then she was painted and...
Keel and masts
Masts Below you can see the making of the masts and gaffs of the Quadra summarized in a few images. Unfortunately, it is difficult to visualize the amount of work: from drawing the designs, making the mast fitings and gaff fittings, cutting all the parts, delivering...
Interior carpentry
After the framework for the walls had been placed and the ship had been insulated in May 2024, carpenter Douwe started on the interior of the ship in June 2024. First, all the walls were placed, so that the layout was already clearly visible. Then the door frames and...
Work first half of 2024
After the transfer of our charter ship Avatar to the new owners at the beginning of November 2023, we first took a well-deserved break. From January 2024, we continued the conversion of the Quadra full-time and have done a lot in the past six months. Partly thanks to...
Steelwork 2023
On January 6, 2023, the Quadra was again towed to SRF shipyard for a new series of work. This time the rudder, propeller shaft, propeller, bow thruster tube, box coolers for the engine and generators, exhausts and other openings/valves in the underwater hull were...
Steelwork ’21-’22
Steelwork, winter 2021/2022 October 16, 2021 is the time to bring the QUADRA to the SRF shipyard in Harlingen. Time to do all the steelwork on the hull. Unfortunately, the parts for the new superstructures and the extension of the stern have not yet been delivered....
Our partners
The construction of the Quadra would not be possible without good partners. We would like to introduce the companies we work with below: Olivier van Meer DesignQuadra: 3D-scan & drawings The OVM office has been involved in the construction, conversion and refit of...
The construction has started – Our plans
After almost a year, the Quadra was towed to the shipyard again last week. This time not for a paint job, but for the real thing: the construction of the sailing yacht is about to begin! In the past week all old superstructures have been removed from the deck, so that...










Om de beste ervaringen te bieden, gebruiken wij technologieën zoals cookies om informatie over je apparaat op te slaan en/of te raadplegen. Door in te stemmen met deze technologieën kunnen wij gegevens zoals surfgedrag of unieke ID's op deze site verwerken. Als je geen toestemming geeft of uw toestemming intrekt, kan dit een nadelige invloed hebben op bepaalde functies en mogelijkheden.