Construction nearing completion

Q

Construction nearing completion

25 Nov 2025

The construction of the Quadra is nearing completion! The carpenter is finished and will only come once more for the final finishing touches. The lighting — both inside and out — is working, water flows from the taps, the ventilation system provides fresh air, and the central heating system warms the ship up in no time. The mattresses and bench cushions were finished some time ago but have finally taken their place on board. The first three sails have been delivered and bended. The remaining sails will arrive soon.

André has installed most of the technical equipment, such as the bow thruster, batteries and inverters, smoke detectors, bilge alarms, some of the navigation equipment, and so on! Just a few more weeks to complete this, and then the inspector will come in December to inspect the Quadra.

Below are some photos to give you a good impression of what it looks like now (click on a photo to enlarge).

We hope to be able to conduct our first sea trials soon. After the inspector has been, we will spend time on the finishing touches and furnishing/decorating the ship.
A new look

A new look

From approximately mid-May to mid-July, Quadra's hull was renovated at Multiship. First, it was filled and sanded. Multiple times and multiple layers were applied until the hull was smooth and the transition to the new keel was smoothed. Then she was painted and...

Keel and masts

Keel and masts

Masts Below you can see the making of the masts and gaffs of the Quadra summarized in a few images. Unfortunately, it is difficult to visualize the amount of work: from drawing the designs, making the mast fitings and gaff fittings, cutting all the parts, delivering...

Interior carpentry

Interior carpentry

After the framework for the walls had been placed and the ship had been insulated in May 2024, carpenter Douwe started on the interior of the ship in June 2024. First, all the walls were placed, so that the layout was already clearly visible. Then the door frames and...

Work first half of 2024

Work first half of 2024

After the transfer of our charter ship Avatar to the new owners at the beginning of November 2023, we first took a well-deserved break. From January 2024, we continued the conversion of the Quadra full-time and have done a lot in the past six months. Partly thanks to...

Steelwork 2023

Steelwork 2023

On January 6, 2023, the Quadra was again towed to SRF shipyard for a new series of work. This time the rudder, propeller shaft, propeller, bow thruster tube, box coolers for the engine and generators, exhausts and other openings/valves in the underwater hull were...

Steelwork ’21-’22

Steelwork ’21-’22

Steelwork, winter 2021/2022 October 16, 2021 is the time to bring the QUADRA to the SRF shipyard in Harlingen. Time to do all the steelwork on the hull. Unfortunately, the parts for the new superstructures and the extension of the stern have not yet been delivered....

Our partners

Our partners

The construction of the Quadra would not be possible without good partners. We would like to introduce the companies we work with below: Olivier van Meer DesignQuadra: 3D-scan & drawings The OVM office has been involved in the construction, conversion and refit of...

The construction has started – Our plans

The construction has started – Our plans

After almost a year, the Quadra was towed to the shipyard again last week. This time not for a paint job, but for the real thing: the construction of the sailing yacht is about to begin! In the past week all old superstructures have been removed from the deck, so that...