After the framework for the walls had been placed and the ship had been insulated in May 2024, carpenter Douwe started on the interior of the ship in June 2024. First, all the walls were placed, so that the layout was already clearly visible. Then the door frames and doors were made. After that, the last trusses and coves were covered in wood.

With the making of the benches, beds and galley, the interior more and more took shape. And when that was done, the most fun phase began: the finishing! With a wainscoting and many details of oak, which had already been given a few layers of varnish by Evelien in advance, the interior became more and more beautiful. The selection of photos below shows the transformation per room.

Walls and Salon:

Doghouse and Cabins aft:
Front cabins and Wainscoting:
Galley:

Woodwork

In the carpentry workshop, not only the doors, frames, tables, cupboard doors and finishing trim and mouldings were made. Lodewijk, Raymond and Aaron also made the wooden gunwale, top capping, skylight, sliding hatch and exterior doors here. These first have to be varnished and will then be mounted on deck in the spring/summer.

It is amazing how an almost empty ship’s hull can be transformed into a complete ship by relatively few people in just over half a year. The carpenters of Lodewijk Meeter Scheepsbetimmering have perfectly fulfilled our wishes for a sleek and yet somewhat classic interior with beautiful oak details.

Keel

In the meantime, the construction kit for the keel extension was also assembled and welded. Because the workshop is not large enough, the keel was made in two parts and then transported to another location. Here, in the spring of 2025, the two keel parts will be welded together and attached under the ship.

More steelwork

After being blasted, the pre-loved bowsprit and cowl ventilators were painted. Friend and welder Arnie had welded the fittings on the bowsprit and then welded the bowsprit to the ship with the help of the carpenter’s eye of carpenter Douwe. Just like the decoration on both sides of the stern.

Construction nearing completion

Construction nearing completion

The construction of the Quadra is nearing completion! The carpenter is finished and will only come once more for the final finishing touches. The lighting — both inside and out — is working, water flows from the taps, the ventilation system provides fresh air, and the...

A new look

A new look

From approximately mid-May to mid-July, Quadra's hull was renovated at Multiship. First, it was filled and sanded. Multiple times and multiple layers were applied until the hull was smooth and the transition to the new keel was smoothed. Then she was painted and...

Keel and masts

Keel and masts

Masts Below you can see the making of the masts and gaffs of the Quadra summarized in a few images. Unfortunately, it is difficult to visualize the amount of work: from drawing the designs, making the mast fitings and gaff fittings, cutting all the parts, delivering...

Work first half of 2024

Work first half of 2024

After the transfer of our charter ship Avatar to the new owners at the beginning of November 2023, we first took a well-deserved break. From January 2024, we continued the conversion of the Quadra full-time and have done a lot in the past six months. Partly thanks to...

Steelwork 2023

Steelwork 2023

On January 6, 2023, the Quadra was again towed to SRF shipyard for a new series of work. This time the rudder, propeller shaft, propeller, bow thruster tube, box coolers for the engine and generators, exhausts and other openings/valves in the underwater hull were...

Steelwork ’21-’22

Steelwork ’21-’22

Steelwork, winter 2021/2022 October 16, 2021 is the time to bring the QUADRA to the SRF shipyard in Harlingen. Time to do all the steelwork on the hull. Unfortunately, the parts for the new superstructures and the extension of the stern have not yet been delivered....

Our partners

Our partners

The construction of the Quadra would not be possible without good partners. We would like to introduce the companies we work with below: Olivier van Meer DesignQuadra: 3D-scan & drawings The OVM office has been involved in the construction, conversion and refit of...

The construction has started – Our plans

The construction has started – Our plans

After almost a year, the Quadra was towed to the shipyard again last week. This time not for a paint job, but for the real thing: the construction of the sailing yacht is about to begin! In the past week all old superstructures have been removed from the deck, so that...